Thursday, September 13, 2007

Picture Lock - Frames delivered to VFX dept.

Finally after a long 2 weeks with no news, i finally met with video director Carlos Cruz, Editor Rodrigo Zozaya, Producer Jaime Tapias to talk about the final cut of the video and have the frames delivered in Targa format to star working on the tracks and stabilization.

After reviewing all 4,500 frames i determined there were at least 9 shots that would need compositing and tracking. Though most of th shots consist of televisions being tracked and video composited on top (video of the band playing) the director was still uncertain about the video they want on the actual televisions, so we determined the best option would be to start tracking the t.v's and saving the tracking data to later apply to the matchmove node (in shake) to track in the video later.

Some still frames of the FX shots will be uploaded as soon as Bloggr works out some bugs with their image upload script.

No comments: